A concrete company organized around Palm Bay's lots, swales and canals
The reason we exist: Palm Bay was already Brevard's largest city and was adding thousands of residents each year, mostly on GDC lots that shed water through a swale into a canal, while much of the new concrete was being placed by whatever crew a builder happened to hire that week.

Palm Bay Concrete Co. is locally operated. It is not a franchise and not a call center. We book and manage concrete jobs in Palm Bay, across Brevard County and in the towns within thirty miles. The crews who carry out that work are insured, pull the Public Works and Building Division permits each job requires, and have placed concrete in every quadrant of the city and in every town listed on this site. Work types: driveways and swale aprons, patios and lanai slabs, new pool decks and resurfacing, stamped finishes, pads, foundation slabs, and repair, lifting and removal of failed concrete.
Some context on the city. The 2020 census counted 119,760 residents; the April 2025 estimate is 146,929. That makes Palm Bay the largest city in the county and one of the fastest-growing in Florida. Nearly all of it sits on the Port Malabar grid General Development Corporation laid out in 1959: quarter-acre lots, a swale along every street, canals that feed the Melbourne-Tillman system and then the lagoon, and a culvert pipe beneath each driveway. Concrete in the northeast units is now in its sixth decade, while the southwest and the Compound are getting slabs for the first time. Between those two, thousands of homes received driveways, aprons, lanais and pool decks placed on sand that was never compacted, over culverts that were never set to grade, by crews that left before the first rainy season.
Working rules
Start with the water
The first item on any estimate is drainage: swale, culvert, downspouts, and the low corner that stays wet through September. Water is what breaks slabs in this city. Concrete over unresolved drainage will not last, and we would rather say that up front than pour the same slab twice.
Base, slope, joints, steel
Sand goes down in compacted lifts and stays above the wet-season level. Surface fall is ¼" per foot away from the house. Control joints go where the slab would crack regardless. Steel sits on chairs at mid-depth instead of lying on the sand. None of this is visible after the pour, and all of it determines how long the slab lasts.
Permits and associations
Any work in the swale or the right-of-way is filed as a Public Works Driveway and Lot Drainage permit, with its two inspections. Structural work, such as a shed, an addition or a screen room, goes to the Building Division under the Florida Building Code. For Bayside Lakes, the SW communities, Viera and the beachside associations, the architectural submittal is prepared before any date is set.
A phone line open 24/7
The line takes calls 24/7, seven days a week. Crews work Monday to Saturday and start placing at first light, ahead of the heat and the afternoon storm. Site visits for estimates are usually booked within a day or two.